problem

  • Limited availability of indispensable components for heaters (sleeves and cast iron).

  • The supplier ceased the production of essential gas burners. 

  • Without an alternative solution, a redesign with unforeseen costs loomed on the horizon. This had to be avoided at all costs. 

Our supplier stopped producing certain parts we needed. Thanks to the reverse engineering process performed by Allimax, we did not need to redesign our products, allowing us to avoid significant unforeseen costs. 
Oplossing hvac

solution

After a thorough analysis of the existing product, Allimex started working on the development of the new gas burner. Due to the nature of the product, we also arranged the required homologation and certification. The alternative product was produced based on the client's highly specific requirements, enabling product continuity. The entire production process was carefully monitored by Allimex.

Oplossing hvac

result?

A happy customer, and not just because of the cost reduction thanks to the continued availability of the component. The reverse engineering also resulted in significant cost savings. 

✓ Guaranteed availability of the product

✓ No unforeseen investments, as the need for a redesign of the end product was eliminated

✓ Cost savings in procurement of parts

✓ All-inclusive service for the client regarding the production process

Would you like more information on this case, or would you like to know how AIP can help you improve your performance? 